If Salt River Project (SRP) is your utility, your bill with solar depends on your SRP price plan. Some SRP plans net the power you send to the grid against the power you use, and others credit it at an export price. You still get an SRP bill each month. SRP sets these plans, and we handle the SRP application for you.
Which SRP price plans are for solar customers?
SRP has these residential price plans for homes with solar:
Newer plans, since the November 2025 billing cycle: Conserve 6-9 p.m. and Save, and Manage Demand 5-10 p.m. and Save.
Older plans: Customer Generation, Average Demand, Time-of-Use Export and Electric Vehicle Export. SRP plans to discontinue them as of the November 2029 billing cycle and move customers still on them to one of the newer plans.
Some plans include a monthly demand charge, based on your highest use during on-peak hours. To compare the plans, see SRP's solar price plans page.
How does SRP credit the power my system sends back?
How SRP credits the power your system sends back depends on your plan:
Customer Generation and Average Demand: the power you send to SRP is netted against the power you use during each billing cycle.
Time-of-Use Export and Electric Vehicle Export: SRP credits each exported kilowatt-hour (kWh) at a fixed export price.
Conserve 6-9 p.m. and Save, and Manage Demand 5-10 p.m. and Save: SRP credits exported power at an export rate that it recalculates every year, with changes taking effect each May billing cycle.
On plans with an export price, using more of your own solar power at home, such as running large appliances at midday, can help. SRP posts its current prices on its plan pages.
What do I need to do to start solar billing with SRP?
To start solar billing with SRP, you need to sign SRP's interconnection agreement, and we handle the rest of the application. SRP must approve your system before it's installed, so we send your application to SRP first. After SRP approves it, SRP sends the property owner the interconnection agreement to sign through DocuSign. Please sign it so your project can move forward.
Your system must stay off until it passes SRP's final inspection, except for testing. SRP then sends a permission to operate letter, and we turn on your system. See What is Permission to Operate (PTO), and how long does it take?
If you add panels later, SRP needs a new application first. Ask us before you change your system.
Where can I read SRP's own solar information?
SRP explains solar bills on its how to read your electric bill page and compares plans on its solar price plans page. For questions about your SRP plan, prices or bill, contact SRP.
Who do I contact about my system?
For your system's production or monitoring, contact Better Earth. If your system is leased or under a power purchase agreement (PPA), contact your finance company first. If your app shows a problem, see Solar system not working or monitoring app not updating? If your bill seems high, see Why is my electric bill high with solar?
