Why is my solar project taking longer than expected?

What usually adds time to a solar project, why some projects wait on the utility, and what you can do to keep yours moving.

Most solar projects wait on approvals that Better Earth doesn't control, such as your city's permit review, your utility's approval and inspections. Extra work on your home, financing steps and documents we still need can also add time. Your Project Manager can tell you what your project is waiting on, and what you can do to help.


​

What usually adds time to a solar project?

These are the most common things that add time to a solar project:


​

Why is my project waiting on my utility?

After your inspection passes, your utility reviews your system before it gives Permission to Operate (PTO). PTO usually comes about 4 weeks after the inspection, but your utility sets the pace. Some projects need extra utility steps:

  • Meter collar: if your system uses a meter collar, PG&E installs it before we can schedule your inspection. PG&E emails you a DocuSign form to sign for that appointment.

  • Utility equipment upgrade: sometimes your utility needs to upgrade its own equipment, such as the transformer that serves your home. Your utility decides how long the upgrade takes, and it can add months to your project. While the upgrade is pending, your utility may give a conditional PTO, so your system can run with limits until the upgrade is done.


​

What can I do to keep my project moving?

These steps help keep your project moving:

  • Reply when your Project Manager asks for something, such as a utility bill, a signature or HOA documents.

  • Watch for emails from your utility or finance company, including DocuSign and PandaDoc emails, and check your spam folder.

  • Keep your phone number and email up to date with us. See How do I update my contact info or monitoring app login?

  • Make sure we and the inspector can reach your equipment, for example by unlocking a gate on inspection day.


​

How do I check where my project is?

To check where your project is, reply to your Project Manager's texts or emails, email [email protected], or call us at (888) 373-9379, Monday to Friday, 8 am to 5 pm Pacific time. Your customer portal also shows your project's stage. See What can I see in my Better Earth customer portal?


​

Will you tell me when my project is delayed?

We text or email you at key steps, such as confirming your site survey and scheduling your installation. If you haven't heard from us and want an update, please contact your Project Manager. You don't need to wait for us to reach out.


​