How does permitting work for my solar installation?

What Better Earth does to get your building permit, what decides how long it takes, and when you may need to help.

Before we can install your solar system, your city or county must approve your plans and issue a building permit. Better Earth prepares the plans, applies for the permit and answers the building department's questions for you. In most cases, you don't need to do anything. Your city or county decides how long its review takes.


​

What does Better Earth do to get my permit?

Better Earth takes these steps to get your building permit:

  1. Plans: we prepare the plans for your system.

  2. Application: we send the application and plans to your city or county building department.

  3. Review: the building department checks your plans against local building and electrical codes.

  4. Corrections: if the building department asks for changes, we make them and send the plans again.

  5. Approval: once your permit is issued, we can schedule your installation.


​

How long does permitting take?

How long permitting takes depends on your city or county. Each building department has its own review steps and workload, and corrections add time. That's why we can't give one timeline for every home.


​

Will I need to do anything during permitting?

In most cases, you won't need to do anything during permitting. Some situations need your help:

  • Signatures: some cities and counties need your signature on the permit application. We tell you if yours does.

  • Homeowners association (HOA): if you have an HOA, you may need to send it a solar application. We can give you the documents you need. HOA approval times vary by community. If your HOA hasn't approved your project by the time it's ready to move forward, you can wait for approval, or sign an acknowledgement so we can continue before approval arrives. Your HOA may still ask for changes or set conditions, so read the acknowledgement carefully.

  • Florida: Florida law requires a Notice of Commencement to be recorded with your county before work starts on most home improvements. If your project needs one, we tell you what you need to do.

  • A visit before approval: in rare cases, a city inspector needs to visit your home before approving the permit.


​

Why haven't I heard from you during permitting?

Permitting is often the quietest part of your project. While your plans are being reviewed, there may be nothing new to share. We contact you when your permit is approved, or if we need something from you.


​

How do I check my permit status?

To check your permit status, text your Project Manager, email [email protected] or call us at (888) 373-9379.


​

What happens after my permit is approved?

After your permit is approved, we order your equipment if needed and contact you to schedule your installation. Most installs take one day. See Your Solar Installation Day


​