Your Solar Installation Day

Learn what to expect on the day your solar system is installed

Updated over 2 weeks ago

Introduction

Installation day is a pivotal moment in your transition to solar energy. It's when the vision of reducing your carbon footprint and energy bills becomes reality. Here's an in-depth look at what you can expect, ensuring you're fully prepared for this transformative day:


The Day of Installation

  • Arrival of the Installation Crew:

    • Timing: Expect the crew to arrive between 7 AM and 10 AM, ready with all the necessary equipment to install your solar panels.

  • Review of Plans:

    • Briefing: Before any work begins, the crew will go over the installation plans with you. This is your chance to clarify any aspects of the installation, ask questions, and ensure everything aligns with your expectations.

  • Installation Process:

    • Steps:

      • Racking System: Installation starts with setting up the racking on your roof or ground, ensuring stability for the panels.

      • Panel Installation: Solar panels are then mounted securely.

      • Wiring: Electrical connections are made, linking the panels to your home's electrical system.

    • Timeline:

      • The duration can vary; smaller systems might wrap up within a day, while larger or more complex setups might need additional days. You'll be informed if your project extends beyond one day.

  • Minimal Involvement for Homeowners:

    • Your Role: Once you've provided access to the necessary areas (like your electrical panel), you're largely free to continue your day. Our crew is trained to work efficiently with minimal disruption to your routine.

  • Completion:

    • Final Checks: By the end of the installation, the team will confirm that all panels are correctly mounted and connections are secure.

  • Cleanup:

    • Post-Installation: We ensure your property is left clean, removing all installation debris and packaging materials.

  • Post-Installation Inspection:

    • Inspection: A city or utility inspector will need to approve the installation. This is usually scheduled within 30 days of installation to verify compliance with local codes.

  • Activation and Monitoring:

    • Permission to Operate (PTO): After inspection, we submit for PTO, which, once granted, allows us to activate your system. Activation typically follows within 4 weeks, at which point you'll gain access to monitoring platforms to track your energy production.

  • Enjoy Your Solar Energy:

    • Benefits: With the system live, you'll begin to see reductions in your electricity bills and enjoy the pride of using sustainable energy.

FAQ for Post-Installation and System Expansion

Q: Can I Add More Panels Later?

  • A: In most cases, yes. However, some utility companies or finance options may limit the extent to which it makes sense to expand your system. Consult with your Project Specialist for more details.

  • If you can expand your solar system, any new panels will be considered a separate installation:

    • Minimum Size: The addition must meet Better Earth's minimum requirement of 6 panels.

    • Financing: New panels won't be covered under existing financing or leasing agreements; they require separate arrangements.

Q: Can Better Earth Uninstall and Reinstall My System?

  • A: Yes, we offer this service. Please submit a service request form on our website for an accurate quote.

Q: Can Better Earth Remove Existing Equipment?

  • A: We can remove existing solar PV systems or solar thermal pool heaters. Note, we can remove but not relocate these systems.

Q: Can I Choose Where the Equipment is Installed?

  • A: You have considerable choice in equipment placement, but some locations might be dictated by local authorities or utility requirements. For full details, refer to our "Where the Equipment is Installed" article.

Additional Questions You Might Have:

Q: What Happens if the Weather is Bad on Installation Day?

  • A: We monitor weather forecasts closely. If conditions are unsafe or unproductive for installation, we'll reschedule, ensuring both safety and quality of work.

Q: Do I Need to Be Home During the Installation?

  • A: While not always mandatory, it's beneficial for you to be available at the start to review plans and at the end for any final questions or confirmation.

Q: How Do I Prepare My Home for Installation Day?

  • A: Ensure clear access to your roof, electrical panel, and any area where equipment will be installed. Clear the driveway or designated parking area for our vehicles.

Q: What If I Notice Issues After Installation?

  • A: We offer a warranty on our work, and our customer service is here to address any post-installation concerns. Contact us immediately if you spot any issues.

Conclusion

Installation day with Better Earth is crafted to be as smooth and informative as possible. We aim to not only install solar panels but also to install confidence in your choice to go solar. With your active participation and our dedicated service, you'll be well on your way to harnessing the power of the sun for your home. Remember, this is just the beginning of your journey towards energy independence and sustainability.