Here's what to expect on the day we install your solar panels and battery, and how to get ready so everything goes smoothly.
Before install day
Review where your equipment goes. Your install page (the link your Project Manager sends) shows your site plan with each part numbered. Locations are set to meet code and safety clearances, so please ask any questions before install day.
Clear about 3 feet in front of your main electrical panel, any sub panels and the wall where your battery goes. If that's in your garage, move cars and stored items away from that wall.
Keep your driveway clear from 7 AM, or tell us where the crew should park.
Unlock gates, put pets inside, and share any gate codes.
Have your Wi-Fi name and password ready. The crew needs them to set up and test your battery.
Tesla Powerwall: download the Tesla app and create an account before install day.
Keep about 3 feet clear in front of your panel and the wall where your battery goes
Install day
Arrival
The crew arrives between 7 and 10 AM. An adult should be home at the start: the crew lead walks through your plan with you before work begins.
Our install vehicle on install day
The work
Solar panels go on your roof.
The battery goes on an outside wall or in your garage, as shown on your plan.
Backup equipment (a backup switch, gateway or meter collar) goes at or near your utility meter, if your system includes backup.
Everything is connected to your electrical panel.
An Enphase battery and combiner box after install
Power off for part of the day
To connect your system safely, your power will be off for part of the day. For backup batteries this is usually about 4 to 6 hours. The crew lead will tell you before it goes off.
Wi-Fi and setup
The crew connects your battery to your Wi-Fi and tests it. Tesla systems are set up in the Tesla app; Enphase systems in the Enphase app.
Cleanup and walkthrough
The crew cleans up and shows you what was installed.
How long it takes
Most installs take one day. Larger systems, a main panel upgrade or other electrical work can take longer, and some panel upgrades need a separate visit with your utility. We'll tell you ahead of time if your install needs more than one day.
After your install
City inspection: usually within about 30 days.
Utility approval (Permission to Operate): usually about 4 weeks after inspection.
Turn-on: once approved, we turn your system on and you'll see it in your monitoring app.
Your battery stays off until your system is approved and turned on.
Common questions
What if the weather is bad?
Light rain usually isn't a problem. If conditions aren't safe, we'll reschedule with you.
Do I need to be home all day?
An adult should be home when the crew arrives for the walkthrough, and someone needs to share your Wi-Fi details. After that, you don't need to stay home the whole time.
What if something changes before install day?
Text your Better Earth Project Manager as soon as you can.