Your designer places every part of your system to meet electrical code, the manufacturer's installation rules, safety clearances and your utility's requirements. That's why we install your equipment exactly as shown on your site plan.
If you have a question about a location, ask your Better Earth Project Manager before install day. Changes on install day can delay your install or need a new permit.
Where each part goes
Solar panels: on your roof
We place panels where they get the most sun. Fire code requires open space (setbacks) along roof edges and ridges so firefighters can move safely, so panels can't go all the way to the edge. If your design uses a ground mount, the panels go in your yard instead.
Finished solar panels on a roof
Battery: outside wall or garage
Tesla Powerwall 3 and Enphase IQ Batteries go on an outside wall or in your garage, never inside living spaces. Each battery needs clear space around it, set by the manufacturer. In a garage, a protective post (bollard) may be needed if a car could hit the battery.
A Tesla Powerwall 3 on an outside wall
An Enphase battery (left) and combiner box (right) on an outside wall
Combiner box (Enphase systems): next to your main panel
A gray box that connects your solar panels to your home. It goes close to your main electrical panel to keep wiring short.
Backup switch or gateway (backup batteries): at your utility meter
For backup systems, this is what lets your home switch to battery power in an outage. Some systems use a meter collar, which fits behind your utility meter and needs your utility's approval.
AC disconnect: outside, usually near your meter
A shut-off switch that lets the utility or a firefighter safely turn off your solar system. Many utilities require it and decide where it goes.
An AC disconnect on an outside wall
Main electrical panel (if you're getting a panel upgrade)
Usually goes where your current panel is. Your utility decides whether it can move. Some upgrades need a separate visit with your utility.
Conduit: the pipe that carries the wiring
Runs between the parts, usually along the outside of your home on the shortest safe route.
Conduit along an outside wall
Keep this space clear
Electrical code requires about 3 feet of open working space in front of your main panel, any sub panels and the wall where your equipment goes. Please clear it before install day: move stored items, and move cars if your equipment goes in the garage.
Keep about 3 feet clear in front of your panel and equipment wall
Common questions
Can I move equipment after I've seen my plan?
Ask your Project Manager as early as you can. Some moves need a new design or a permit change, and some aren't possible because of clearances. We can't redesign your system on install day.
Why can't the battery go inside my house?
Code doesn't allow home batteries in living spaces. Garages and outside walls are allowed when the manufacturer's clearances are met.
Will I see the plan before the crew starts?
Yes. Your install page (the link your Project Manager sends when your install is scheduled) shows your site plan with each part numbered. On install day, the crew lead walks through the plan with you before starting.