What are the steps and timeline for my solar project?

The stages of your solar project from signing to turn-on, what affects how long each one takes, and how we keep in touch.

After you sign, your solar project moves through 7 stages: site survey, design, permits, installation, city inspection, utility approval and turn-on. How long it takes depends mostly on your city or county, your utility and any extra work your home needs, so timing is different for every home. Your Project Manager can tell you where your project is.


​

What are the stages of my solar project?

Your solar project moves through these stages, in this order:

  1. Site survey: a surveyor checks your roof, your electrical panel and where your equipment can go. See What happens at my solar site survey?

  2. Design: our design team finishes your system design. If your home needs extra work, such as a main panel upgrade or roof work, we tell you.

  3. Permits: we apply for your building permit, and your city or county reviews it. See How does permitting work for my solar installation?

  4. Installation: most installs take one day. See Your Solar Installation Day, or Your Solar and Battery Installation Day if you're getting a battery.

  5. City inspection: an inspector checks the finished work, usually within about 30 days of your installation.

  6. Utility approval: after your inspection passes, we apply to your utility for Permission to Operate (PTO). Approval usually comes about 4 weeks after the inspection. See What is Permission to Operate (PTO), and how long does it take?

  7. Turn-on: once your utility approves, we turn on your system and you get access to your monitoring app. See What happens after my solar system is installed?


​

How long does my solar project take?

How long your solar project takes depends on your city or county, your utility and your home, so we can't give one timeline for every project. These things can add time:

  • Approval from a homeowners association (HOA).

  • A main panel upgrade or roof work.

  • Changes that the building department asks for.

  • A battery or other added equipment.

  • Documents we still need from you, such as a utility bill or a signature.


​

How will I hear about my project?

We text or email you at key steps, such as confirming your site survey and scheduling your installation. Before install day, you can read Where your equipment goes, and why


​

Who do I contact about my project?

Your Project Manager is your main contact until your system is turned on. You can text your Project Manager or email [email protected]. You can also call us at (888) 373-9379.


​

What if you need something from me?

If we need something from you, such as a utility bill, a signature or HOA documents, your Project Manager contacts you. Sending it back helps keep your project on schedule.


​